Secant Pile Wall Construction And Installation


 

Secant pile walls are constructed by drilling in a series of alternating primary (drilled first) and secondary (drilled second) overlapping shafts to form a continuous secant wall. The concrete in the shafts can be all low-strength, all high-strength, or a combination of low-strength primary and high-strength secondary shafts. Steel piles or reinforcing steel are typically placed in the secondary shafts. Unreinforced high-strength shafts can also be constructed in a self-supporting circular ring, such as those frequently used for access shafts to tunnels.